Recent Refit Projects
90ft Motor / Sailor
Project Manager for the owner of this vessel, designed by Joubert / Nivelt / Goeffers and built by the builder JFA in Concarneau. Construction began in Summer 2006 and was completed in 2009.
Designed for long journeys, this vessel, made of aluminium, with a displacement of 120 tons, in equipped with 2 carbon masts.


JFA Shipyard
Trimaran 60 Racing / Cruising
Project Manager for the owner of this vessel, designed by Irens/Cabaret as a racing vessel. The integral construction is made of carbon by the builder Marsaudon Comosites, in Lorient. Construction began in April 2008 and its completion is estimated to be Autumn 2009.
Designed for sporty cruising, this trimaran was constructed with the most sophisticated of techniques and she benefitted from all of the most recent technological advances, reserved only for racing yachts.
Equipped with a carbon mast, this yacht carries out the most impressive performances without jeopardising the comfort of the crew. A rare product.

François Boucher Project Manager